Installation Location of Solar Photovoltaic Bracket

The installation of solar pv stent location: building roof or wall and ground, installation direction: appropriate for south (tracking system exception), installation Angle: equal or close to install local latitude, load requirements: load, snow load, seismic requirements, arrangement and spacing: combined with the conditions of local sunshine quality requirements: 10 years does not rust, 20 years don’t reduce the rigidity, 25 years still have a certain structure stability.

Good adaptability in design: good design and modular design make the bracket itself adaptable to the environment; Hot dip galvanized material, galvanized thickness can reach more than 80um, to ensure 25 years of anti-corrosion time; Aluminum also meets the national standard of 15um oxidation treatment, long life, can be recycled resources.


Post time: Dec-17-2020